{"id":834,"date":"2025-09-06T16:50:35","date_gmt":"2025-09-06T16:50:35","guid":{"rendered":"https:\/\/africadiplomacy.net\/?p=834"},"modified":"2025-09-06T16:50:37","modified_gmt":"2025-09-06T16:50:37","slug":"prime-minister-dr-nsengiyumva-briefed-on-operations-of-shema-power-plant-generating-56-megawatts-of-electricity","status":"publish","type":"post","link":"https:\/\/africadiplomacy.net\/?p=834","title":{"rendered":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took place on September 6, 2025, during the Prime Minister\u2019s working visit to Rubavu District.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He was informed that the plant has already added 50 megawatts to the national grid, while the remaining six megawatts are used to sustain the plant\u2019s operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Located in Busoro Cell, Nyamyumba Sector, Rubavu District, the construction of the Shema Power Plant began in October 2019 and was completed in February 2024, with an investment of 400 billion Rwandan francs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first phase of methane gas exploitation from Lake Kivu dates back to May 2016, when the project began supplying 25 megawatts to the grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Government of Rwanda has prioritized expanding electricity access as part of its economic recovery and development agenda. A major milestone was the launch of the Electricity Access Rollout Program (EARP) in 2009, aimed at significantly increasing the number of households with electricity connections across the country.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Author: Justinmind HARERIMANA<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-834","post","type-post","status-publish","format-standard","hentry","category-politics"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"AFRICA DIPLOMACY NETWORK\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/africadiplomacy.net\/?p=834\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"AFRICA DIPLOMACY NETWORK -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK\" \/>\n\t\t<meta property=\"og:description\" content=\"Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/africadiplomacy.net\/?p=834\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/africadiplomacy.net\/wp-content\/uploads\/2025\/06\/Africa-Diplomacy-Logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/africadiplomacy.net\/wp-content\/uploads\/2025\/06\/Africa-Diplomacy-Logo.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-09-06T16:50:35+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-09-06T16:50:37+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/africadiplomacy.net\/wp-content\/uploads\/2025\/06\/Africa-Diplomacy-Logo.png\" \/>\n\t\t<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t\t<meta name=\"twitter:data1\" content=\"AFRICA DIPLOMACY NETWORK\" \/>\n\t\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#blogposting\",\"name\":\"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK\",\"headline\":\"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity\",\"author\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/africadiplomacy.net\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/cropped-Africa-Diplomacy-Logo.png\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/#articleImage\",\"width\":512,\"height\":512},\"datePublished\":\"2025-09-06T16:50:35+00:00\",\"dateModified\":\"2025-09-06T16:50:37+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#webpage\"},\"articleSection\":\"POLITICS\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/africadiplomacy.net#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/africadiplomacy.net\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?cat=5#listItem\",\"name\":\"POLITICS\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?cat=5#listItem\",\"position\":2,\"name\":\"POLITICS\",\"item\":\"https:\\\/\\\/africadiplomacy.net\\\/?cat=5\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#listItem\",\"name\":\"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/africadiplomacy.net#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#listItem\",\"position\":3,\"name\":\"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?cat=5#listItem\",\"name\":\"POLITICS\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/#organization\",\"name\":\"AFRICA DIPLOMACY NETWORK\",\"url\":\"https:\\\/\\\/africadiplomacy.net\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/africadiplomacy.net\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/cropped-Africa-Diplomacy-Logo.png\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834\\\/#organizationLogo\",\"width\":512,\"height\":512},\"image\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?author=1#author\",\"url\":\"https:\\\/\\\/africadiplomacy.net\\\/?author=1\",\"name\":\"AFRICA DIPLOMACY NETWORK\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7370572b1ae186bda773bee72ee9e867ce5f7e43e13c45b1d33ba1dfecdc2fff?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"AFRICA DIPLOMACY NETWORK\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#webpage\",\"url\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834\",\"name\":\"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK\",\"description\":\"Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?p=834#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/?author=1#author\"},\"datePublished\":\"2025-09-06T16:50:35+00:00\",\"dateModified\":\"2025-09-06T16:50:37+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/#website\",\"url\":\"https:\\\/\\\/africadiplomacy.net\\\/\",\"name\":\"AFRICA DIPLOMACY NETWORK\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/africadiplomacy.net\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK","description":"Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took","canonical_url":"https:\/\/africadiplomacy.net\/?p=834","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/africadiplomacy.net\/?p=834#blogposting","name":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK","headline":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity","author":{"@id":"https:\/\/africadiplomacy.net\/?author=1#author"},"publisher":{"@id":"https:\/\/africadiplomacy.net\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/africadiplomacy.net\/wp-content\/uploads\/2025\/06\/cropped-Africa-Diplomacy-Logo.png","@id":"https:\/\/africadiplomacy.net\/#articleImage","width":512,"height":512},"datePublished":"2025-09-06T16:50:35+00:00","dateModified":"2025-09-06T16:50:37+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/africadiplomacy.net\/?p=834#webpage"},"isPartOf":{"@id":"https:\/\/africadiplomacy.net\/?p=834#webpage"},"articleSection":"POLITICS"},{"@type":"BreadcrumbList","@id":"https:\/\/africadiplomacy.net\/?p=834#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/africadiplomacy.net#listItem","position":1,"name":"Home","item":"https:\/\/africadiplomacy.net","nextItem":{"@type":"ListItem","@id":"https:\/\/africadiplomacy.net\/?cat=5#listItem","name":"POLITICS"}},{"@type":"ListItem","@id":"https:\/\/africadiplomacy.net\/?cat=5#listItem","position":2,"name":"POLITICS","item":"https:\/\/africadiplomacy.net\/?cat=5","nextItem":{"@type":"ListItem","@id":"https:\/\/africadiplomacy.net\/?p=834#listItem","name":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity"},"previousItem":{"@type":"ListItem","@id":"https:\/\/africadiplomacy.net#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/africadiplomacy.net\/?p=834#listItem","position":3,"name":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity","previousItem":{"@type":"ListItem","@id":"https:\/\/africadiplomacy.net\/?cat=5#listItem","name":"POLITICS"}}]},{"@type":"Organization","@id":"https:\/\/africadiplomacy.net\/#organization","name":"AFRICA DIPLOMACY NETWORK","url":"https:\/\/africadiplomacy.net\/","logo":{"@type":"ImageObject","url":"https:\/\/africadiplomacy.net\/wp-content\/uploads\/2025\/06\/cropped-Africa-Diplomacy-Logo.png","@id":"https:\/\/africadiplomacy.net\/?p=834\/#organizationLogo","width":512,"height":512},"image":{"@id":"https:\/\/africadiplomacy.net\/?p=834\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/africadiplomacy.net\/?author=1#author","url":"https:\/\/africadiplomacy.net\/?author=1","name":"AFRICA DIPLOMACY NETWORK","image":{"@type":"ImageObject","@id":"https:\/\/africadiplomacy.net\/?p=834#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/7370572b1ae186bda773bee72ee9e867ce5f7e43e13c45b1d33ba1dfecdc2fff?s=96&d=mm&r=g","width":96,"height":96,"caption":"AFRICA DIPLOMACY NETWORK"}},{"@type":"WebPage","@id":"https:\/\/africadiplomacy.net\/?p=834#webpage","url":"https:\/\/africadiplomacy.net\/?p=834","name":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK","description":"Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/africadiplomacy.net\/#website"},"breadcrumb":{"@id":"https:\/\/africadiplomacy.net\/?p=834#breadcrumblist"},"author":{"@id":"https:\/\/africadiplomacy.net\/?author=1#author"},"creator":{"@id":"https:\/\/africadiplomacy.net\/?author=1#author"},"datePublished":"2025-09-06T16:50:35+00:00","dateModified":"2025-09-06T16:50:37+00:00"},{"@type":"WebSite","@id":"https:\/\/africadiplomacy.net\/#website","url":"https:\/\/africadiplomacy.net\/","name":"AFRICA DIPLOMACY NETWORK","inLanguage":"en-US","publisher":{"@id":"https:\/\/africadiplomacy.net\/#organization"}}]},"og:locale":"en_US","og:site_name":"AFRICA DIPLOMACY NETWORK -","og:type":"article","og:title":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK","og:description":"Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took","og:url":"https:\/\/africadiplomacy.net\/?p=834","og:image":"https:\/\/africadiplomacy.net\/wp-content\/uploads\/2025\/06\/Africa-Diplomacy-Logo.png","og:image:secure_url":"https:\/\/africadiplomacy.net\/wp-content\/uploads\/2025\/06\/Africa-Diplomacy-Logo.png","article:published_time":"2025-09-06T16:50:35+00:00","article:modified_time":"2025-09-06T16:50:37+00:00","twitter:card":"summary_large_image","twitter:title":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity - AFRICA DIPLOMACY NETWORK","twitter:description":"Prime Minister Dr. Justin Nsengiyumva has been briefed on the operations of the Shema Power Plant, which generates 56 megawatts of electricity from methane gas extracted from Lake Kivu. The plant has played a significant role in increasing Rwanda\u2019s electricity supply through the extraction and processing of methane gas from the lake. The briefing took","twitter:image":"https:\/\/africadiplomacy.net\/wp-content\/uploads\/2025\/06\/Africa-Diplomacy-Logo.png","twitter:label1":"Written by","twitter:data1":"AFRICA DIPLOMACY NETWORK","twitter:label2":"Est. reading time","twitter:data2":"1 minute"},"aioseo_meta_data":{"post_id":"834","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2025-09-06 16:50:37","updated":"2025-09-06 17:01:29","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/africadiplomacy.net\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/africadiplomacy.net\/?cat=5\" title=\"POLITICS\">POLITICS<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tPrime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/africadiplomacy.net"},{"label":"POLITICS","link":"https:\/\/africadiplomacy.net\/?cat=5"},{"label":"Prime Minister Dr. Nsengiyumva Briefed on Operations of Shema Power Plant Generating 56 Megawatts of Electricity","link":"https:\/\/africadiplomacy.net\/?p=834"}],"_links":{"self":[{"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=\/wp\/v2\/posts\/834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=834"}],"version-history":[{"count":1,"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=\/wp\/v2\/posts\/834\/revisions"}],"predecessor-version":[{"id":835,"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=\/wp\/v2\/posts\/834\/revisions\/835"}],"wp:attachment":[{"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/africadiplomacy.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}